Project Management and Site Supervision for the construction of a new electric glass melter (150Tpd) (to produce high quality liquor bottles)
Mooving a forehearth on a running furnace
Interim Project Manager - Batch house & Cullet return system
Basic layout for new glass decorating plant
Interim Project Manager - Audit Batch house & Cullet return system
Project Management and Site supervision for a new glass plant (Float Glass)
Detail Engineering for a new furnace regenerator
Production manager (crisis situation) in a tableware plant
Basic engineering for a glass plant extension (to double the capacity)
Furnace & Batch house audits - Engineering & Erection of a new forehearth on a running furnace
Consultant for the erection of machines (layout & civil works)
Consultancy (batch house, electric melter, oxygas melter, filter)
Project management for a new furnace (140tpd), including field supervision
Audit of 2 furnaces and repair proposals
Feasibility study for the setup of a glass processing facility
New layout for production and batch house
Basic engineering for the production layout and the buildings for a new glass plant (Green field)
Procedure and documents for production follow-up (from batch to packing)
Complete engineering for the extension of an existing glass plant (bottle production) – from batch house to packing…
Upgrading and maintenance program for an existing recycling plant
Feasibility study of a new glass plant in Middle East
Basic engineering for the production layout and the buildings for a new tableware glass plant. Detailed engineering for the pipe-work and the utilities
Complete audit of an existing glass plant before take over by new owner
Complete engineering, project management and site supervision in an existing glass plant (from a worldwide known group) with replacement of complete production lines, including :
general layout drawings hot end and cold end
detail engineering for IS machines support and platforms at all levels
engineering for an overhead crane to install above IS machines in production
cooling duct design for 8, 10 and 16 section machines
hot cullet collecting with automatic emergency systems and direct recycling
basement reorganization (improvement of circulation and safety)
heavy safety procedures
Complete feasability study including :
general layout showing all needed equipment from batch house to packing
optimization of flows (production, goods and people)
proposals for new buildings and new auxiliary equipment
Again… extension of a glass recycling plant (for flat glass recycling)
Layout for a complete new glass decoration plant (serigraphy of tableware)
Complete project management of a 240 tpd furnace rebuild, including field supervision (6 weeks from glass to glass)
Extension of an existing glass recycling plant
Feasibility study for the erection of a new glass plant
Audit and advises in a tableware plant for a furnace rebuild
Consulting for the erection of a new plant for bottle production
complete furnace audit and proposals for repairs
supply, erection and start-up of a new glass plant (500 Kg/day) with used and overhauled equipment
new layout for production and batch house extension
basic layout for feasibility study
3D model of a glass furnace for a catalog
3D design of new glasses for a catalog
Study, construction and start-up for a glass recycling plant for float glass (10Ton/hour).
Construction and layout drawings for a new batch house for container glass.
Construction and layout drawings and stability calculations for a new batch house for container glass.
3D-design of special shape beer glass for a brewery.
3D-design of big perfume bottle (Guerlain - Shalimar).
Construction drawings and stability calculations for a batch silo in an existing building.
Basic engineering for the production layout and the buildings for a new glass plant. Detailed engineering for the pipe-work, electricity supply and distribution, and the utilities.
Consultancy job for a furnace rebuild
Study and rebuild of a furnace 300Ton/day. Very low budget and very short time schedule.
Restructuration of an existing glass plant, under receivership. Management by objectives. Optimization of labor forces, organization and communication. Business plan and preparation for a new restart after bankruptcy.
Basic design of a new furnace 300Ton/day with oxy-burners.
Study and rebuild of a furnace 180Ton/day, end fired, and the production lines with 4 IS-machines, lehrs, cold-end, packing.
Rebuild of a furnace 230Ton/day, cross fired, and the production lines with 4 IS-machines (6 and 3 x 10 sections), lehrs, cold-end, packing. New batch house with recuperation of existing storage silos.
Study and construction of a full-automatic recycling plant for bottles and jars, 35Ton/hour.
New factory with construction of a new furnace 320Ton/day, end fired, and the production lines with 3 IS-machines (3 x 12 sections), lehrs, cold-end, packing and shrinking. New buildings for the complete production lines, including offices, workshops, warehouses and social building.
Study of a complete new modern glass plant on a green field, with 2 end fired furnaces 400Ton/day.
Basic design and rebuild of a furnace 300Ton/day, end fired, and the production lines with 4 IS-machines (6, 8, 10 and 12 sections), lehrs, cold-end, packing. New glass recuperation system for cold and hot glass.
Partial turn-key job. New installation in existing plant of a furnace 150Ton/day, end fired, and the production lines with 2 IS-machines (2 x 8 sections), lehrs, cold-end, packing. New furnace and hot-end building.
Study and rebuild of a furnace 120Ton/day, end fired, including the production lines with 2 IS-machines (6 and 10 sections), lehrs, cold-end, packing. The furnace was a new design made by the GPM-team. New furnace and hot-end building.
Study and construction of a new furnace 180 Ton/day, end fired, and 3 production lines with IS-machines, lehrs, cold-end, packing
Rebuild of an existing furnace 190Ton/day, cross fired, and the production lines with 3 IS-machines (3 x 8 sections), lehrs, cold-end, packing